LEAD TIME:
January 2019 – August 2019
INVESTOR:
OLEOFARM SP. Z O.O.
CONTRACTORS:
ERBUD S.A.
SCOPE OF IMPLEMENTATION:
- Mechanical ventilation system with a total capacity of 25 000m3/h
- Dainwater drainage system (gravity and siphonic)
- Chilled water installation with a total capacity of 1,5MW
- Cold, hot and circulation water installation
- Fire-fighting system (hydrant)
- Technological heat installation
- Central heating installation
- Sanitary sewage installation
- Technological steam installation
- Split air conditioning installation