LEAD TIME:
September 2016 – March 2017
INVESTOR:
KNOLL POLSKA SP. Z O.O.
CONTRACTORS:
NELLE SP. Z O.O.
SCOPE OF IMPLEMENTATION:
- Thermal node based on 170kW ground heat pumps
- Dainwater drainage system (gravity and siphonic)
- Mechanical ventilation system of the hall and office building
- Central heating and technological heat installation
- Cold, hot and circulation water installation
- Chilled water installation with a capacity of 110kW
- Gas boiler room with a capacity of 450kW
- Sanitary sewerage installation
- Air conditioning installation
- Gas installation