LEAD TIME:
June 2018 – March 2019
INVESTOR:
CREDIN POLSKA SP. Z O.O.
CONTRACTORS:
ART BUILDING SP. Z O.O. SP. K.
SCOPE OF IMPLEMENTATION:
- Mechanical ventilation system with a total capacity of 30 000m3/h
- Dainwater drainage system (gravity)
- Cold, hot and circulation water installation
- Fire-fighting system (hydrant)
- Chilled water installation with a capacity of 230kW
- Technological heat installation
- Kotłownia gazowa o mocy 130kW
- Central heating installation
- Gas boiler room with a capacity of 130kW
- Sanitary sewerage installation
- Split air conditioning installation